Toilet renovation: at Which to Begin

The bathroom is a room with special requirements: high humidity, temperature differences. That’s why making repairs in the bathroom, you need to definitely plan the entire operating process, to consider the sequence of measures to be performed. Within the following article, you will learn the way to start the repair in the restroom and what kinds of work ought to be carried out with your hands. Step-by-step directions for bathroom repair

Stage 1: Establishing a plan and deciding upon a design solution.

Repair in the toilet can be of two types:

  • Unplanned, spontaneous, originating from the will of unexpected conditions. As an example, in case of an pipe burst, flooding by neighbors.
  • Planned, which is either cosmetic or capital. It requires preparation, serious monetary investment and time.

Begin repairs in the bathroom is to determine the plan, inside. Think through the last detail, what’s going to be the room, pick a color. Pastel colors are conventional, as well as a mixture of blue and blue, or peach with beige.

Begin repairs at the bathroom is to find out the plan, interior design. Consider detail, what will be the space, select a colour. Pastel colors are considered traditional, in addition to a combination of colours.

Next point is the option of facing substance. Generally, finishing at the toilet is performed with tile, porcelain tiles, mosaicand plastic panels. Examine the pipes, whether it needs to be replaced. If necessary, choose a suitable choice. Proceed to the measuring work: step all sides, calculate the area of the room. Based on these data, we mark the location of the plumbing fixtures.

Step 2: the choice of sanitary fittings and substance for completing.

It’s very important to recognize that the purchase price of sanitary ware precedes the preparation stage, rather than vice versa. This usually means that first we create a design project, create a plan, and then go to the store. The following point – you need to specify the size of your favorite plumbing fixtures and examine the program, whether it fits.

It’s crucial to recognize that the cost of vsyakuhnya.ru plumbing fittings is preceded by a planning period, and not vice versa. This means that first we create a design project, make a plan, then go to the store. Another one

As for materials for completing, it is better to purchase them immediately for the whole repair cycle, in order that then you won’t be diverted if something was missing. Do not forget about preparing the essential tools.

Step 3: dismantling tiling and plumbing.

Once All of the preliminary work is completed, proceed to the beginning of the work process:

  • Eliminate the sink and tub from the space, even though they won’t be replaced with new ones. This manner, you may keep them intact and clean.
  • Eliminate the tile, cleaning following it all surfaces: ceiling, walls, flooring.
  • Remove old paint from the walls, even if they had been formerly painted, since the glue solution or a new layer of paint will not stick to the surface.

Measure 4: Cost of communications: plumbing, electric wiring.

Very often in an old house, you ought to carefully inspect and replace not just the pipes which are in the toilet itself, but in addition the principal riser, and on occasion the interfloor plumbing. Why is it worth doing this? Old pipes anytime may give a flow, then the new repair is going to be emptied, it will call for additional investment to get rid of flaws.